ENG-Z1-00125 – Zone 1 Phase 4
(Design and Construction of Storage Facilities and Assembly Building)


Project Owner: TIP Construction Management | Client: HEC – House Engineering Contracting
Location: Tawazun Industrial Park (TIP), Al Ajban, Abu Dhabi, UAE
Awarded Date: February 2026 | Duration: 3 Months
Scope of Works: Preparation of existing ground including watering and compaction with (+5 cm) shoulder filling as per approved drawings; supply and application of 300 mm thick compacted subgrade; supply and application of 200 mm thick aggregate subbase (Type II, CBR > 30%) in two layers; supply and installation of geogrid material; supply and application of 150 mm thick granular subbase (Type II, CBR > 60%); supply and application of 50 mm asphalt binder course; supply and application of 50 mm asphalt concrete wearing course; application of prime coat and tack coat; road marking works; mobilization and demobilization; and all required laboratory testing as per project specifications.








Trans Gulf General Contracting
info@tggc.ae
+971-56-4120769
© 2025. All rights reserved.
TGGC
+971-02-5516505
Business Hour
Sunday To Thursday 08.00 – 17.00
Mussafah M17, Abu Dhabi, UAE
FAX : +971 2 5516506
